Concrete driveway cost by size
Size moves the price more than anything else. In Greensboro, going from 10 x 20 ft (1 car, short) to 10 x 100 ft (long single) takes the job from $1,640-$2,340 to $6,470-$8,770, so have the size measured before comparing quotes.
| Size | Cost |
|---|---|
| 10 x 20 ft (1 car, short) | $1,640-$2,340 |
| 12 x 24 ft (1 car) | $2,170-$3,050 |
| 20 x 20 ft (2 car, short) | $2,840-$3,950 |
| 24 x 24 ft (2 car)Most common | $3,910-$5,360 |
| 24 x 36 ft (3 car) | $5,650-$7,680 |
| 10 x 100 ft (long single) | $6,470-$8,770 |
Installed: Plain gray concrete, broom finish
Concrete driveway cost by material or type
The gap between options is wide: stained or saw-cut patterns costs about 2.0 times as much as plain gray concrete, broom finish in Greensboro, and resurfacing overlay (on sound old slab) trims about 33%.
| Type | Typical job | Installed |
|---|---|---|
| Gravel (for comparison) | $1,520-$2,530 | $1.90-$3.13 installed |
| Resurfacing overlay (on sound old slab) | $2,440-$3,790 | $3.49-$5.30 installed |
| Asphalt (for comparison) | $2,920-$4,350 | $4.33-$6.29 installed |
| Plain gray concrete, broom finishMost common | $3,910-$5,360 | $6.04-$8.04 installed |
| Swirl or trowel finish | $4,110-$5,630 | $6.39-$8.50 installed |
| Rock salt finish | $4,310-$5,930 | $6.74-$9.03 installed |
| Exposed aggregate | $4,750-$6,510 | $7.51-$10.04 installed |
| Colored concrete | $4,770-$6,590 | $7.54-$10.17 installed |
Show 5 more options
| Type | Typical job | Installed |
|---|---|---|
| Broom finish with stamped border | $4,930-$6,840 | $7.82-$10.61 installed |
| Pervious (porous) concrete | $5,630-$7,900 | $9.03-$12.46 installed |
| Stamped concrete | $6,810-$9,310 | $11.08-$14.90 installed |
| Stained or saw-cut patterns | $7,780-$10,730 | $12.77-$17.35 installed |
| Pavers (for comparison) | $7,870-$11,090 | $12.92-$17.99 installed |
Materials include waste and contractor markup. Typical job: 576 sq ft
What will your Greensboro driveway cost?
We have already loaded Greensboro prices for this concrete driveway estimate. Enter your project details and ZIP code for a free planning estimate.
Add-ons and extra work
These 7 extras are where quotes most often grow. The largest single line in Greensboro is "Apron / curb cut" at $673-$1,110 for the job, so ask whether it is included.
- Remove old driveway$2.13-$3.01 / sq ft
- Rebar grid (instead of mesh)$0.97-$2.19 / sq ft
- Fiber reinforcement$0.42-$0.62 / sq ft
- 6 in. slab instead of 4 in.$1.15-$1.54 / sq ft
- Apron / curb cut$673-$1,110 / job
- Heated driveway (hydronic or electric)$13.45-$22.31 / sq ft
- Sealer$0.33-$0.46 / sq ft
Show material-only prices
| Add-on | Materials |
|---|---|
| Remove old driveway | $0.34-$0.69 / sq ft |
| Rebar grid (instead of mesh) | $0.52-$1.61 / sq ft |
| Fiber reinforcement | $0.11-$0.23 / sq ft |
| 6 in. slab instead of 4 in. | $0.92-$1.24 / sq ft |
| Apron / curb cut | $173-$460 / job |
| Heated driveway (hydronic or electric) | $6.90-$13.80 / sq ft |
| Sealer | $0.11-$0.18 / sq ft |
Installed price per unit
What makes Greensboro different for this job
Greensboro homes and the local housing stock
What a driveway costs against a Greensboro home
60% of Greensboro units are houses with their own lots, and 50% of homes are owner-occupied, so a driveway is usually the owner's call, subject to HOA rules where they apply.
The midpoint of the range above is about 1.9% of Greensboro's $244,800 median home value, the 52nd highest share for a new concrete driveway among 147 markets and near the middle of the pack.
Local planning note for Greensboro
How Greensboro compares with nearby cities
Set against what homes are worth, pouring a driveway costs Greensboro owners more than their neighbors: 1.9% of the median home value, compared with 0.8% in Cary.
Comparing Greensboro with its neighbors, BLS puts concrete finishers' median pay 17% below the U.S. median in Cary but 22% below the U.S. median in Durham, a gap that tends to show up in new concrete driveway quotes.
| City | Typical job (midpoint) | Share of median home value | Pay for concrete finishers vs U.S. |
|---|---|---|---|
| Greensboro | $4,635 | 1.9% | -19% |
| Durham | $4,545 | 1.2% | -22% |
| Cary | $4,715 | 0.8% | -17% |
Typical job: midpoint of NumeralQ's typical-job range for each city. Pay: BLS May 2025 median for the trade vs the U.S. median.
When to plan this work in Greensboro
Concrete weather in Greensboro
For a new concrete driveway in Greensboro, the simplest pours happen outside November through March, when the average low at the Greensboro Airport weather station is under 40°F. Below that mark, ACI's cold-weather practices apply: pouring in the warmest part of the day and covering the slab so it can't freeze while it cures.
Driveway concrete for Greensboro's climate
NOAA's normals count about 68 freezing nights a year in Greensboro, compared with medians of 71 across North Carolina weather stations and 124 across U.S. stations.
Where concrete freezes and thaws, the residential code calls for air-entrained concrete with a higher minimum strength, so ask for the mix in the quote.
Driveway work that touches the curb or sidewalk usually needs a city right-of-way permit even when the slab itself does not.
| Nights at or below 32°F | 68 |
|---|---|
| Yearly snowfall (nearby station) | 7.1 in |
| Yearly precipitation | 44.0 in |
| Contractor license (North Carolina) | General contractor license for projects of $40,000 or more |
| Where to check a license | NC Licensing Board for General Contractors |
Local data checked October 2026 · Sources at the bottom of the page
Exterior work in Greensboro historic districts
District/overlay only
Within a Greensboro local historic district overlay, a Certificate of Appropriateness is needed to build, alter, move or demolish exterior parts of buildings and site features such as walls, fences, steps and paving, whether or not a building permit is needed. Reviewed features include window and door type and may include color; ordinary maintenance without a change in design, material or appearance is exempt, and staff may approve listed minor work.
Applies only inside a Greensboro local historic district; new off-street parking generally must be behind the main building.
Greensboro Land Development Ordinance 30-4-12 (certificate of appropriateness) · Checked October 10, 2026
Watershed rules for paving and additions in Greensboro
District/overlay only
For Greensboro lots in a designated water-supply watershed, the city's watershed rules apply to new grading, paving, gravel and structures. Exempt work includes like-for-like replacement of built-upon area outside stream buffers, additions of no more than 400 square feet of built-upon area outside a required stream buffer, and a single-family home and accessory structures on a lot of record created before July 1, 1993, outside the two watershed critical area tiers.
Check your parcel on the Greensboro Designated Watershed Map; built-upon limits from an approved watershed plan or plat still apply.
Greensboro Land Development Ordinance 30-12-3.4 and 30-12-4 (watershed regulations) · Checked October 10, 2026
How Greensboro compares with nearby cities
Labor rates
On a concrete driveway job in Greensboro, concrete finishers earn a median $22.13 an hour. After insurance, payroll taxes and overhead, contractors bill about $44-$58 per worker-hour.
Cement Masons and Concrete Finishers
Median pay: BLS May 2025. Billed rate: what a contractor charges per worker-hour, estimated at 2.0 to 2.6 times pay (insurance, payroll taxes, overhead, profit).
Before you sign in Greensboro
Get every quote to include
- measured area, thickness, finish, and concrete specification
- excavation, subbase, reinforcement, joints, and drainage
- removal, haul-away, access, and site restoration
- whether curb, sidewalk, frontage, or right-of-way work is included
Frequently Asked Questions
How much does Concrete Driveway cost in Greensboro, NC?
Concrete driveway cost in Greensboro, NC: $3,910-$5,360 (typical job: 576 sq ft). Each option in the price table above has its own range.
How does pay for cement masons in the Greensboro-High Point area compare with the national median?
Median pay for cement masons in the Greensboro-High Point, NC metro area is 19% below the national median, according to BLS data for May 2025. Pay is one input to a quote, not the price itself.
How many 90-degree days does Greensboro get?
About 33 days a year reach 90°F or hotter at a nearby NOAA station, against 28 at the median U.S. station.
What climate zone is Greensboro in?
Guilford County is in climate zone 3A on the DOE's county list, which energy codes use to set insulation and window levels.
Ready for your own number?
We have already loaded Greensboro prices for this concrete driveway estimate. Enter your project details and ZIP code for a free planning estimate.
Sources and methodology
- NumeralQ estimator (pricing as of 2026-10-26)
- Fixr cost guide, retrieved 2026-10-26
- Home Depot online prices, store 121, retrieved 2026-10-26
- NumeralQ estimate (no single published range; set from material prices and typical install hours)
- Ready-mix delivered price, 2026 trade reporting ($130-$175/cu yd)
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 (https://www.bls.gov/oes/)
- City permit fee schedules, retrieved October 2026 (see the permit line for this page's source)
- NumeralQ pricing model v2: materials plus local labor, methodology at /methodology
- U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates, place-level tables B25018 (median rooms), B25035 (median year built), B25077 (median home value), B25024 (units in structure), B25003 (owner and renter occupancy) and B25041 (bedrooms) (https://data.census.gov/)
- NumeralQ pricing model v2: typical-job midpoints for all 147 markets, compared with the Census median home value (methodology at /methodology)
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025, metro-area median pay by trade compared with the U.S. median (https://www.bls.gov/oes/tables.htm)
- NOAA National Centers for Environmental Information, U.S. Climate Normals 1991–2020, monthly normals for the nearest station: average high and low, days with 0.10 in. of precipitation or more, heating and cooling degree days (https://www.ncei.noaa.gov/data/normals-monthly/1991-2020/access/)
- American Concrete Institute, ACI 306R-16 Guide to Cold Weather Concreting: cold weather exists when air temperature has fallen to, or is expected to fall below, 40°F during the protection period; summarized in NIH Office of Research Facilities, Cold Weather Concreting, Technical Bulletin, April 2021 (https://orf.od.nih.gov/TechnicalResources/Documents/Technical%20Bulletins/21TB/Cold%20Weather%20Concreting%20-%20April%202021%20Technical%20Bulletin_508%20.pdf)
- NOAA climate normals source
- IRC concrete weathering rules source
- NC Licensing Board for General Contractors source
- DOE climate zone guide source
NumeralQ planning estimate. How we estimate