Storm damage record around Richmond
Local Cost Overview
From 2016 to 2025, Richmond city and the 2 counties around it had 304 NOAA reports of thunderstorm wind at 58 mph or more and 83 reports of hail 1 inch or larger.
That's 423.9 wind reports per 1,000 square miles; the Virginia figure is 211.3 and the U.S. figure is 48.8. NOAA reports track where people are to see them, so busy metro areas tend to log more.
Reports cluster in May through July, which hold 60% of the total.
Wind and hail leave different marks: lifted shingles and loose flashing after wind, bruising and granule loss after hail. A written repair scope should say which it found.
Storm record for Richmond city roofs| Damaging wind (58 mph+) in Richmond city, 2016–2025 | 30 reports |
|---|
| Large hail (1 in+) in Richmond city | 3 reports |
|---|
| FEMA strong-wind rating (county) | Relatively Low |
|---|
| Months with the fewest reports (area) | Oct, Nov, Dec |
|---|
| Roofer license (Virginia) | Roofing specialty (ROC) on the contractor license |
|---|
| Where to check a license | Virginia DPOR Board for Contractors |
|---|
Local data checked October 2026 · Sources at the bottom of the page
Richmond homes and the local housing stock
Richmond homes and roof repairs
Census figures put the median construction year at 1959 in Richmond and 1984 for Chesapeake, Norfolk and Virginia Beach, and house age shapes most roof repairs here. 52% of Richmond's housing units are one-unit houses and 44% of homes are owner-occupied, so most roof repairs here are split between owners, landlords and associations.
With half of Richmond's homes 67 years old or more, repairs often land on aging roofs. Ask the roofer whether patching makes sense against InterNACHI's 20- to 30-year shingle life.
Approval before exterior repairs in Richmond historic districts
District/overlay only
Within a Richmond Old and Historic District, exterior construction, alteration, repair or restoration must be approved by the Commission of Architectural Review, and no building permit may be issued until a certificate of appropriateness is obtained. Applications must show the proposed materials, texture and color, and the city's fee schedule includes an administrative approval category for some work.
Applies only inside a designated district; which in-kind repairs qualify for staff approval is set by the commission's guidelines.
Richmond City Code Sec. 30-930.6(a) · Checked October 10, 2026