Solar panels cost by size
Find your size in the table. In Vermont the range runs from $10,340-$13,510 for 4 kW to $27,950-$36,530 for 12 kW; a quote that does not state the measured size is hard to compare.
| Size | Cost |
|---|---|
| 4 kW | $10,340-$13,510 |
| 5 kW | $12,760-$16,680 |
| 6 kW | $15,120-$19,770 |
| 7 kW | $17,420-$22,770 |
| 8 kWMost common | $19,650-$25,690 |
| 9 kW | $21,820-$28,520 |
| 10 kW | $23,930-$31,280 |
| 11 kW | $25,970-$33,940 |
| 12 kW | $27,950-$36,530 |
Solar panels cost by material or type
What will your Vermont solar system cost?
We have already loaded Vermont prices for this solar panel installation estimate. Enter your project details and ZIP code for a free planning estimate.
Pick your city
| City | Typical job | Link |
|---|---|---|
| Burlington | $19,650-$25,690 | Burlington |
State conditions
Local planning note for Vermont
What sets Burlington apart
Burlington is the only Vermont market on this site. BLS puts solar installers' median pay there at 7% below the U.S. median. Against a median home value of $444,800, the typical job is roughly 5.1% of the house.
| City | Pay for solar installers vs U.S. | Solar permit | Yearly output per kW installed | Typical job as share of median home value |
|---|---|---|---|---|
| Burlington | -7% (state figure) | Not published | 1,192 kWh | 5.1% |
Pay: BLS May 2025 metro median for the trade vs the U.S. median. Permit: base fee from the city's own schedule, before surcharges; "Not published" means no priceable figure was found online.
Labor rates
For solar panel installation in Vermont, contractors bill about $48-$62 per worker-hour for solar installers, whose median pay is $23.79 an hour. The difference covers insurance, taxes, overhead and profit.
Before you sign in Vermont
Get every quote to include
- system size, equipment models, and any storage configuration
- roof, structural, electrical, and service-panel work
- utility interconnection steps and who submits each application
- ownership, warranties, fees, exclusions, and payment assumptions
Local planning note for Vermont
How Vermont lien law affects a solar install
If a sub or supplier on your solar install isn't paid, the law may let them file a lien on the house even when you paid your contractor. In Vermont, a sub's lien is limited to what you still owed when you got its written notice (9 V.S.A. 1921(b)).
Liens must be recorded within 180 days after payment was due and followed by a court attachment (1924). Advance waivers are unenforceable. On a solar install, the panel and inverter distributor and any electrician the installer subcontracts are the likely lien claimants.
Frequently Asked Questions
What do solar panels cost in Vermont?
It isn't a contractor bid.
How does pay for solar electricians in Burlington compare with the national median?
In Burlington, pay for solar electricians is 6% above the national median (BLS, May 2025).
Can solar panels handle hail in Vermont?
Hail is a small risk here: NOAA logged no two-inch-plus hail in Vermont from 2016 to 2025, and panels certified to IEC 61215 are tested against one-inch hail.
Do I need a permit to add solar in Vermont?
Yes. Expect a building or electrical permit from your city or county plus your utility's interconnection approval before the system can turn on.
Should I replace my roof before going solar in Vermont?
Many installers recommend it if the roof is near the end of its life, since removing and reinstalling panels later adds cost. 56% of Vermont homes were built before 1980 (Census).
Ready for your own number?
We have already loaded Vermont prices for this solar panel installation estimate. Enter your project details and ZIP code for a free planning estimate.
Sources and methodology
- EnergySage solar cost data, retrieved 2026-10-26
- NumeralQ estimator (pricing as of 2026-10-26)
- SolarReviews solar cost data, retrieved 2026-10-26
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 (https://www.bls.gov/oes/)
- City permit fee schedules, retrieved October 2026 (see the permit line for this page's source)
- NumeralQ pricing model v2: materials plus local labor, methodology at /methodology
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025, metro-area median pay by trade compared with the U.S. median (https://www.bls.gov/oes/tables.htm)
- EU Joint Research Centre PVGIS 5.2 with NREL NSRDB irradiance: yearly output per installed kW, 20° tilt, south-facing, 14% system losses (https://re.jrc.ec.europa.eu/pvg_tools/en/)
- U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates, place-level tables B25018 (median rooms), B25035 (median year built), B25077 (median home value), B25024 (units in structure), B25003 (owner and renter occupancy) and B25041 (bedrooms) (https://data.census.gov/)
- NumeralQ pricing model v2: typical-job midpoints for all 147 markets, compared with the Census median home value (methodology at /methodology)
- Levelset, Vermont lien law FAQs (statute sections as cited there), checked November 10, 2026 (https://www.levelset.com/mechanics-lien/vermont-lien-law-faqs/)
Installed: Rooftop solar, string or microinverters