Solar panels cost by size
Size moves the price more than anything else. In Maine, going from 4 kW to 12 kW takes the job from $11,700-$15,280 to $31,630-$41,310, so have the size measured before comparing quotes.
| Size | Cost |
|---|---|
| 4 kW | $11,700-$15,280 |
| 5 kW | $14,440-$18,870 |
| 6 kW | $17,120-$22,360 |
| 7 kW | $19,710-$25,750 |
| 8 kWMost common | $22,240-$29,050 |
| 9 kW | $24,700-$32,260 |
| 10 kW | $27,080-$35,370 |
| 11 kW | $29,390-$38,390 |
| 12 kW | $31,630-$41,310 |
Solar panels cost by material or type
What will your Maine solar system cost?
We have already loaded Maine prices for this solar panel installation estimate. Enter your project details and ZIP code for a free planning estimate.
Pick your city
| City | Typical job | Link |
|---|---|---|
| Portland | $22,240-$29,050 | Portland |
State conditions
Local planning note for Maine
What sets Portland apart
NumeralQ prices one Maine market, Portland. Pay for solar installers there is 15% above the U.S. median, per BLS, and labor is the part of the bill that moves most from place to place. Against a median home value of $489,600, the typical job is roughly 5.2% of the house. The city's own fee schedule puts the permit at about $75 for the standard job in the table.
| City | Pay for solar installers vs U.S. | Solar permit | Yearly output per kW installed | Typical job as share of median home value |
|---|---|---|---|---|
| Portland | +15% (state figure) | $75 | 1,264 kWh | 5.2% |
Pay: BLS May 2025 metro median for the trade vs the U.S. median. Permit: base fee from the city's own schedule, before surcharges; "Not published" means no priceable figure was found online.
Labor rates
For solar panel installation in Maine, contractors bill about $59-$77 per worker-hour for solar installers, whose median pay is $29.43 an hour. The difference covers insurance, taxes, overhead and profit.
Before you sign in Maine
Get every quote to include
- system size, equipment models, and any storage configuration
- roof, structural, electrical, and service-panel work
- utility interconnection steps and who submits each application
- ownership, warranties, fees, exclusions, and payment assumptions
Local planning note for Maine
Maine consumer protections for a solar install
In Maine, home construction contracts over $3,000 must be in writing, and the down payment is limited to one-third of the price (10 M.R.S. 1487). Whatever the size of your solar install, pay by check or card rather than cash so each payment can be proved later.
Local planning note for Maine
How Maine lien law affects a solar install
Anyone who works on a solar install or supplies material for it, and isn't paid, may be able to file a mechanic's lien against the house. In Maine, on an owner-occupied home, anyone without a direct contract with you is limited to what you still owe the contractor, unless you paid after getting their notice (10 M.R.S. 3255(3)).
Once a notice arrives, hold back the amount claimed until the contractor shows that party was paid. Liens must be filed within 90 days after last work (3253). On a solar install, the panel and inverter distributor and any electrician the installer subcontracts are the likely lien claimants.
Frequently Asked Questions
What do solar panels cost in Maine?
It isn't a contractor bid.
How does pay for solar electricians in Portland compare with the national median?
In Portland, pay for solar electricians is 13% above the national median (BLS, May 2025).
Can solar panels handle hail in Maine?
Panels certified to IEC 61215 are tested against one-inch hail. NOAA logged 3 reports of two-inch-plus hail in Maine from 2016 to 2025, so check that your home insurance covers the panels.
Do I need a permit to add solar in Maine?
Yes. Expect a building or electrical permit from your city or county plus your utility's interconnection approval before the system can turn on.
Should I replace my roof before going solar in Maine?
Many installers recommend it if the roof is near the end of its life, since removing and reinstalling panels later adds cost. 54% of Maine homes were built before 1980 (Census).
Ready for your own number?
We have already loaded Maine prices for this solar panel installation estimate. Enter your project details and ZIP code for a free planning estimate.
Sources and methodology
- EnergySage solar cost data, retrieved 2026-10-26
- NumeralQ estimator (pricing as of 2026-10-26)
- SolarReviews solar cost data, retrieved 2026-10-26
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 (https://www.bls.gov/oes/)
- City permit fee schedules, retrieved October 2026 (see the permit line for this page's source)
- NumeralQ pricing model v2: materials plus local labor, methodology at /methodology
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025, metro-area median pay by trade compared with the U.S. median (https://www.bls.gov/oes/tables.htm)
- EU Joint Research Centre PVGIS 5.2 with NREL NSRDB irradiance: yearly output per installed kW, 20° tilt, south-facing, 14% system losses (https://re.jrc.ec.europa.eu/pvg_tools/en/)
- U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates, place-level tables B25018 (median rooms), B25035 (median year built), B25077 (median home value), B25024 (units in structure), B25003 (owner and renter occupancy) and B25041 (bedrooms) (https://data.census.gov/)
- NumeralQ pricing model v2: typical-job midpoints for all 147 markets, compared with the Census median home value (methodology at /methodology)
- NumeralQ comparison of city base permit fees for standard jobs ($15,000 re-roof, $12,000 HVAC replacement, 150 ft fence), read from each city's fee schedule on 26 Oct 2026
- Maine Revised Statutes 10 s.1487, checked November 10, 2026 (https://legislature.maine.gov/statutes/10/title10sec1487.html)
- Levelset, Maine lien law FAQs (statute sections as cited there), checked November 10, 2026 (https://www.levelset.com/mechanics-lien/maine-lien-law-faqs/)
Installed: Rooftop solar, string or microinverters