New Orleans homes and the local housing stock
Who landscapes in New Orleans
The median owner-occupied home in New Orleans is valued at $315,700, well above the $206,800 median for Baton Rouge and Shreveport, which is the backdrop for landscaping jobs here.
56% of New Orleans units are houses with their own lots, and 51% of homes are owner-occupied, so yard work is usually the owner's call, subject to HOA rules where they apply.
New Orleans's climate for yards and gardens
Local Cost Overview
New Orleans averages 60.1 inch of rain and melted snow a year, according to NOAA's 1991–2020 normals, against 61.5 inches at the median Louisiana station and 37.5 inches at the median U.S. station.
The USDA hardiness zone for central New Orleans is 9b; check plant tags against it.
The station also averages 2 freezing nights and 86 days at 90°F or hotter a year.
Any digging deeper than a garden bed should start with a free call to 811 to mark buried lines.
Landscaping in New Orleans at a glance| USDA hardiness zone (central ZIP) | 9b |
|---|
| Yearly precipitation | 60.1 in |
|---|
| Nights at or below 32°F / days 90°F+ | 2 / 86 |
|---|
| Contractor license (Louisiana) | Home improvement registration ($7,500 to $75,000); residential license above $75,000 |
|---|
| Where to check a license | Louisiana State Licensing Board for Contractors |
|---|
Local data checked October 2026 · Sources at the bottom of the page
Basic refresh by yard size
| Yard (sq ft) | Basic refresh |
|---|
| 200 | $502-$796 |
|---|
| 500 | $882-$1,380 |
|---|
| 1000 | $1,650-$2,550 |
|---|
| 2000 | $3,230-$4,930 |
|---|
| 5000 | $7,760-$11,740 |
|---|
Basic refresh: sod on 70% of the yard, mulched beds on 30%, edging, shrubs
Paving and open space limits in New Orleans
City rule
In New Orleans' Historic Urban Neighborhood residential zoning districts, the zoning ordinance requires at least 30 percent of the lot to stay permeable open space, and limits impervious surface to 40 percent of the front yard and 40 percent of a corner side yard. Some of these districts instead set permeable open space by lot width: 30 percent for lots 40 feet wide or narrower and 40 percent for wider lots.
These figures cover Historic Urban Neighborhood districts only; other zoning districts set their own limits, so check the zoning district for the lot.
New Orleans Comprehensive Zoning Ordinance Article 11, Table 11-2A: Bulk and Yard Regulations · Checked October 8, 2026