Concrete driveway cost by size
Size moves the price more than anything else. In Boise, going from 10 x 20 ft (1 car, short) to 10 x 100 ft (long single) takes the job from $1,830-$2,590 to $7,300-$9,850, so have the size measured before comparing quotes.
| Size | Cost |
|---|---|
| 10 x 20 ft (1 car, short) | $1,830-$2,590 |
| 12 x 24 ft (1 car) | $2,430-$3,390 |
| 20 x 20 ft (2 car, short) | $3,200-$4,410 |
| 24 x 24 ft (2 car)Most common | $4,400-$6,000 |
| 24 x 36 ft (3 car) | $6,370-$8,620 |
| 10 x 100 ft (long single) | $7,300-$9,850 |
Installed: Plain gray concrete, broom finish
Concrete driveway cost by material or type
Material choice is the second big lever in Boise. Resurfacing overlay (on sound old slab) runs $2,780-$4,230, about 33% under plain gray concrete, broom finish, while stained or saw-cut patterns costs $8,950-$12,250.
| Type | Typical job | Installed |
|---|---|---|
| Gravel (for comparison) | $1,660-$2,710 | $2.08-$3.36 installed |
| Resurfacing overlay (on sound old slab) | $2,780-$4,230 | $4.02-$5.99 installed |
| Asphalt (for comparison) | $3,270-$4,810 | $4.88-$7.00 installed |
| Plain gray concrete, broom finishMost common | $4,400-$6,000 | $6.83-$9.07 installed |
| Swirl or trowel finish | $4,650-$6,320 | $7.26-$9.62 installed |
| Rock salt finish | $4,870-$6,670 | $7.65-$10.22 installed |
| Exposed aggregate | $5,370-$7,310 | $8.51-$11.34 installed |
| Colored concrete | $5,380-$7,380 | $8.53-$11.45 installed |
Show 5 more options
| Type | Typical job | Installed |
|---|---|---|
| Broom finish with stamped border | $5,600-$7,710 | $8.92-$12.03 installed |
| Pervious (porous) concrete | $6,310-$8,800 | $10.15-$13.92 installed |
| Stamped concrete | $7,810-$10,620 | $12.75-$17.08 installed |
| Pavers (for comparison) | $8,810-$12,320 | $14.49-$20.04 installed |
| Stained or saw-cut patterns | $8,950-$12,250 | $14.73-$19.91 installed |
Materials include waste and contractor markup. Typical job: 576 sq ft
What will your Boise driveway cost?
We have already loaded Boise prices for this concrete driveway estimate. Enter your project details and ZIP code for a free planning estimate.
Add-ons and extra work
Check which of these 7 items your quote includes. The costliest line in Boise is "Apron / curb cut" at $782-$1,250 for the job.
- Remove old driveway$2.52-$3.51 / sq ft
- Rebar grid (instead of mesh)$1.06-$2.32 / sq ft
- Fiber reinforcement$0.48-$0.71 / sq ft
- 6 in. slab instead of 4 in.$1.20-$1.61 / sq ft
- Apron / curb cut$782-$1,250 / job
- Heated driveway (hydronic or electric)$13.81-$22.78 / sq ft
- Sealer$0.37-$0.52 / sq ft
Show material-only prices
| Add-on | Materials |
|---|---|
| Remove old driveway | $0.34-$0.69 / sq ft |
| Rebar grid (instead of mesh) | $0.52-$1.61 / sq ft |
| Fiber reinforcement | $0.11-$0.23 / sq ft |
| 6 in. slab instead of 4 in. | $0.92-$1.24 / sq ft |
| Apron / curb cut | $173-$460 / job |
| Heated driveway (hydronic or electric) | $6.90-$13.80 / sq ft |
| Sealer | $0.11-$0.18 / sq ft |
Installed price per unit
What makes Boise different for this job
Boise homes and the local housing stock
What a driveway costs against a Boise home
In Boise, a city of mostly houses (71% of units), a driveway is typically hired by the owner. Ask whether an HOA covers your lot before choosing materials.
Measured against the $484,800 median home value, a typical new concrete driveway in Boise is about 1.1% of the house, the 35th lowest share of the 147 markets on this site.
Which home projects need a permit in Boise
City rule
The City of Boise's homeowner guide lists a building permit as required to re-roof, to install new or replacement windows or doors or change an opening's size, to build a deck or concrete patio more than 12 inches above grade, to put up a fence more than 7 feet high, and to finish an attic, garage or basement into living space. Driveways need no building permit but do need Planning and Zoning approval.
The guide is a summary and Boise's adopted code governs; unincorporated Ada County and nearby cities such as Meridian and Eagle have their own rules.
City of Boise: Homeowner's Guide to Residential Construction · Checked October 9, 2026
When to plan this work in Boise
Concrete weather in Boise
ACI treats concrete work as cold-weather work when the air is expected to fall below 40°F while the slab is curing, and below that concrete gains strength slowly. In Boise, average lows are under 40°F in November through April at the Boise Air Terminal weather station, so a pour then needs insulating blankets, a cold-weather mix or accelerators, which can add to the bill.
Heat is the other extreme: average highs reach 90°F or more in July and August in Boise, when crews tend to pour early in the morning so the surface doesn't dry out before it's finished.
Boise Concrete Driveway Pricing — 2026 Local Market
Concrete driveway cost in Boise, ID: $4,400-$6,000 (typical job: 576 sq ft).
Freeze-thaw and concrete in Boise
Boise averages 108 nights a year at or below freezing, according to NOAA's 1991–2020 normals, compared with medians of 172 across Idaho weather stations and 124 across U.S. stations.
In freeze-thaw climates the model code requires air-entrained concrete for driveways and slabs; ask the contractor to name the mix and strength.
The station averages 17.6 inches of snow a year, and deicing salts are hard on a new slab in its first winter, so ask about sealing.
Driveway work that touches the curb or sidewalk usually needs a city right-of-way permit even when the slab itself does not.
| Nights at or below 32°F | 108 |
|---|---|
| Yearly snowfall (nearby station) | 17.6 in |
| Yearly precipitation | 11.5 in |
| Contractor license (Idaho) | Contractor registration for jobs over $2,000 (no exam) |
| Where to check a license | Idaho DOPL |
Local data checked October 2026 · Sources at the bottom of the page
Labor rates
On a concrete driveway job in Boise, concrete finishers earn a median $26.95 an hour, 2% below the U.S. median. After insurance, payroll taxes and overhead, contractors bill about $54-$70 per worker-hour.
Cement Masons and Concrete Finishers
Median pay: BLS May 2025. Billed rate: what a contractor charges per worker-hour, estimated at 2.0 to 2.6 times pay (insurance, payroll taxes, overhead, profit).
Before you sign in Boise
Get every quote to include
- measured area, thickness, finish, and concrete specification
- excavation, subbase, reinforcement, joints, and drainage
- removal, haul-away, access, and site restoration
- whether curb, sidewalk, frontage, or right-of-way work is included
Frequently Asked Questions
How much does Concrete Driveway cost in Boise, ID?
Concrete driveway cost in Boise, ID: $4,400-$6,000 (typical job: 576 sq ft). Each option in the price table above has its own range.
How does pay for cement masons in the Boise City area compare with the national median?
Median pay for cement masons in the Boise City, ID metro area is 2% below the national median, according to BLS data for May 2025. Pay is one input to a quote, not the price itself.
How many 90-degree days does Boise get?
About 55 days a year reach 90°F or hotter at a nearby NOAA station, against 28 at the median U.S. station.
What climate zone is Boise in?
Ada County is in climate zone 5B on the DOE's county list, which energy codes use to set insulation and window levels.
Ready for your own number?
We have already loaded Boise prices for this concrete driveway estimate. Enter your project details and ZIP code for a free planning estimate.
Sources and methodology
- NumeralQ estimator (pricing as of 2026-10-26)
- Fixr cost guide, retrieved 2026-10-26
- Home Depot online prices, store 121, retrieved 2026-10-26
- NumeralQ estimate (no single published range; set from material prices and typical install hours)
- Ready-mix delivered price, 2026 trade reporting ($130-$175/cu yd)
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 (https://www.bls.gov/oes/)
- City permit fee schedules, retrieved October 2026 (see the permit line for this page's source)
- NumeralQ pricing model v2: materials plus local labor, methodology at /methodology
- U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates, place-level tables B25018 (median rooms), B25035 (median year built), B25077 (median home value), B25024 (units in structure), B25003 (owner and renter occupancy) and B25041 (bedrooms) (https://data.census.gov/)
- NumeralQ pricing model v2: typical-job midpoints for all 147 markets, compared with the Census median home value (methodology at /methodology)
- NOAA National Centers for Environmental Information, U.S. Climate Normals 1991–2020, monthly normals for the nearest station: average high and low, days with 0.10 in. of precipitation or more, heating and cooling degree days (https://www.ncei.noaa.gov/data/normals-monthly/1991-2020/access/)
- American Concrete Institute, ACI 306R-16 Guide to Cold Weather Concreting: cold weather exists when air temperature has fallen to, or is expected to fall below, 40°F during the protection period; summarized in NIH Office of Research Facilities, Cold Weather Concreting, Technical Bulletin, April 2021 (https://orf.od.nih.gov/TechnicalResources/Documents/Technical%20Bulletins/21TB/Cold%20Weather%20Concreting%20-%20April%202021%20Technical%20Bulletin_508%20.pdf)
- NOAA climate normals source
- IRC concrete weathering rules source
- Idaho DOPL source
- DOE climate zone guide source
We start from a national baseline and adjust it for Boise (0.99×). How we estimate