Solar panels cost by size
The biggest driver is size: 4 kW costs $10,460-$13,670 in Florida, while 12 kW costs $28,280-$36,960, about 170% more. Ask every contractor to quote the same measured size.
| Size | Cost |
|---|---|
| 4 kW | $10,460-$13,670 |
| 5 kW | $12,910-$16,880 |
| 6 kW | $15,300-$20,000 |
| 7 kW | $17,630-$23,040 |
| 8 kWMost common | $19,890-$25,990 |
| 9 kW | $22,080-$28,860 |
| 10 kW | $24,210-$31,650 |
| 11 kW | $26,280-$34,350 |
| 12 kW | $28,280-$36,960 |
Solar panels cost by material or type
What will your Florida solar system cost?
We have already loaded Florida prices for this solar panel installation estimate. Enter your project details and ZIP code for a free planning estimate.
Pick your city
| City | Typical job | Link |
|---|---|---|
| Cape Coral | $19,890-$25,990 | Cape Coral |
| Clearwater | $20,030-$26,170 | Clearwater |
| Fort Lauderdale | $19,390-$25,350 | Fort Lauderdale |
| Jacksonville | $19,890-$25,990 | Jacksonville |
| Miami | $19,390-$25,350 | Miami |
| Orlando | $19,030-$24,880 | Orlando |
| Sarasota | $19,890-$25,990 | Sarasota |
| St. Petersburg | $20,030-$26,170 | St. Petersburg |
| Tampa | $20,030-$26,170 | Tampa |
| West Palm Beach | $19,390-$25,350 | West Palm Beach |
State conditions
Local planning note for Florida
How Florida's cities differ for this job
BLS figures put a 8-point spread in solar installers' pay across Florida: Clearwater at 4% below the U.S. median, Orlando at 12% below the U.S. median, and labor is a large part of solar installs. The permit ranges from about $0 in Miami to $120 in Tampa for the same job, each read from the city's own schedule.
Sunlight is the biggest swing factor: a kW of panels makes about 1,627 kWh a year in Clearwater and 1,487 kWh in Jacksonville, per PVGIS. Home values change how big the bill feels: the typical job is 7.8% of the median home in Jacksonville but 4.3% in Miami.
| City | Pay for solar installers vs U.S. | Solar permit | Yearly output per kW installed | Typical job as share of median home value |
|---|---|---|---|---|
| Cape Coral | -5% (state figure) | Not published | 1,601 kWh | 6.1% |
| Clearwater | -4% | Not published | 1,627 kWh | 6.4% |
| Fort Lauderdale | -9% | Not published | 1,548 kWh | 4.6% |
| Jacksonville | -5% (state figure) | Not published | 1,487 kWh | 7.8% |
| Miami | -9% | $0 | 1,548 kWh | 4.3% |
| Orlando | -12% | Not published | 1,521 kWh | 5.6% |
| Sarasota | -5% (state figure) | Not published | 1,604 kWh | 5.0% |
| St. Petersburg | -4% | Not published | 1,627 kWh | 6.2% |
| Tampa | -4% | $120 | 1,579 kWh | 5.5% |
| West Palm Beach | -9% | Not published | 1,527 kWh | 5.4% |
Pay: BLS May 2025 metro median for the trade vs the U.S. median. Permit: base fee from the city's own schedule, before surcharges; "Not published" means no priceable figure was found online.
Local planning note for Florida
Solar tax breaks and HOA rules in Florida
Florida has these solar rules worth checking before you sign. Property tax: Solar panels, inverters and batteries on a home are left out of its assessed value for property tax (Fla. Stat. 193.624). Sales tax: Certified solar energy systems are exempt from Florida sales tax (Fla. Stat. 212.08(7)(hh)).
Also in Florida, for solar panels: HOA rules: An HOA can't prohibit solar collectors, though it can decide where on the roof they go as long as they still work effectively (Fla. Stat. 163.04).
Labor rates
For solar panel installation in Florida, contractors bill about $49-$63 per worker-hour for solar installers, whose median pay is $24.30 an hour. The difference covers insurance, taxes, overhead and profit.
Before you sign in Florida
Get every quote to include
- system size, equipment models, and any storage configuration
- roof, structural, electrical, and service-panel work
- utility interconnection steps and who submits each application
- ownership, warranties, fees, exclusions, and payment assumptions
Local planning note for Florida
What Florida law says about contractor deposits and contracts
In Florida, if a contractor takes more than 10% up front, they must apply for permits within 30 days and start work within 90 days of the permit, unless you agree in writing to longer (Fla. Stat. 489.126). If a contractor takes your money and can't pay a judgment, Florida's Homeowners' Construction Recovery Fund pays up to $100,000 per Division I claim and $30,000 per Division II claim for contracts signed on or after July 1, 2024, if you had a written contract with a licensed contractor and won a judgment or restitution order (Fla. Stat. 489.143(3)). Before you sign for a solar install, make sure the payment schedule follows these rules and that the contract names the contractor's license or registration number.
Local planning note for Florida
How Florida lien law affects a solar install
A mechanic's lien is a claim against your house by someone who worked on your solar install or supplied material for it and wasn't paid. Florida subs and suppliers send a Notice to Owner within 45 days of starting (Fla. Stat. 713.06), and if you pay the contractor without checking those notices you can be forced to pay twice. Contracts over $2,500 must carry the state's lien warning (713.015).
Before the final payment, get the contractor's final payment affidavit (713.06(3)(d)) and a statutory release from every party that sent you a notice. On a solar install, the panel and inverter distributor and any electrician the installer subcontracts are the likely lien claimants.
Frequently Asked Questions
What do solar panels cost in Florida?
They are planning estimates, not contractor bids.
Does pay for solar electricians vary across Florida?
Yes. Pay for solar electricians runs from 18% below the national median in Sarasota to 4% below in Clearwater (BLS, May 2025).
Can solar panels handle hail in Florida?
Panels certified to IEC 61215 are tested against one-inch hail. NOAA logged 42 reports of two-inch-plus hail in Florida from 2016 to 2025, so check that your home insurance covers the panels.
Do I need a permit to add solar in Florida?
Yes. Expect a building or electrical permit from your city or county plus your utility's interconnection approval before the system can turn on.
Should I replace my roof before going solar in Florida?
Many installers recommend it if the roof is near the end of its life, since removing and reinstalling panels later adds cost. 34% of Florida homes were built before 1980 (Census).
Ready for your own number?
We have already loaded Florida prices for this solar panel installation estimate. Enter your project details and ZIP code for a free planning estimate.
Sources and methodology
- EnergySage solar cost data, retrieved 2026-10-26
- NumeralQ estimator (pricing as of 2026-10-26)
- SolarReviews solar cost data, retrieved 2026-10-26
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 (https://www.bls.gov/oes/)
- City permit fee schedules, retrieved October 2026 (see the permit line for this page's source)
- NumeralQ pricing model v2: materials plus local labor, methodology at /methodology
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025, metro-area median pay by trade compared with the U.S. median (https://www.bls.gov/oes/tables.htm)
- EU Joint Research Centre PVGIS 5.2 with NREL NSRDB irradiance: yearly output per installed kW, 20° tilt, south-facing, 14% system losses (https://re.jrc.ec.europa.eu/pvg_tools/en/)
- U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates, place-level tables B25018 (median rooms), B25035 (median year built), B25077 (median home value), B25024 (units in structure), B25003 (owner and renter occupancy) and B25041 (bedrooms) (https://data.census.gov/)
- NumeralQ pricing model v2: typical-job midpoints for all 147 markets, compared with the Census median home value (methodology at /methodology)
- NumeralQ comparison of city base permit fees for standard jobs ($15,000 re-roof, $12,000 HVAC replacement, 150 ft fence), read from each city's fee schedule on 26 Oct 2026
- Florida Statutes 193.624, checked November 10, 2026 (https://m.flsenate.gov/Statutes/193.624)
- Florida Statutes 212.08, checked November 10, 2026 (https://flsenate.gov/Laws/Statutes/2025/0212.08)
- Florida Statutes 163.04, checked November 10, 2026 (https://flsenate.gov/Laws/Statutes/2025/0163.04)
- Florida Statutes 489.143, checked November 10, 2026 (http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0489/Sections/0489.143.html)
- Florida Statutes 489.126, checked November 10, 2026 (https://flsenate.gov/Laws/Statutes/2025/0489.126)
- Levelset, Florida lien law FAQs (statute sections as cited there), checked November 10, 2026 (https://www.levelset.com/mechanics-lien/florida-lien-law-faqs/)
Installed: Rooftop solar, string or microinverters